After verifying the SG of the rinse/reclaim, the appropriate pumps wil的中文翻譯

After verifying the SG of the rinse

After verifying the SG of the rinse/reclaim, the appropriate pumps will start. Flow sensors in all the feed lines plus the cooling water loop must verify the flow or the system will shutdown. The SG of the mixture will be checked, compared to the desired set point, then the pump speed varied accordingly to achieve the desired value. Normally the R/R flow is held constant, the flow of acid is varied. After a preselected time period, the SG is again determined and speed adjustments made. During the adjustment period, all the mixed acid is directed pack to Tank R1. When the measured gravity is within +/- 0.005 of the required value, the mixed acid is diverted to the appropriate mixed acid storage tank. Should the gravity drift outside the desired range, the mixed acid will diverted back to Tank R1, and the system will continue to make adjustments in attempt to achieve the desired value. Should the system not be able to achieve the desired value over a preselected period, 10-15 minutes, the system will shut down and an alarm shall sound.

System will continue mixing until the selected tank is full. It will then search until it finds another tank that has reach the low level setting.


5.2 Collection/Distribution

5.2.1 Tanks

The conventional system will typically include the following storage tanks;

Description No. of Tanks
Rinse/Reclaim 2-3
Fill Acid (1.150 SG) 1-2
Refill Acid (low gravity-1.320) 1
Refill Acid (mid gravity-1.345) 1
Refill Acid (mid-gravity-1.390) 1-2
Pasting Acid 1

Total 7-10

Rinse/reclaim Tank R1will be approximately 4,000 gallon (recommend 5000-6000gallon to solve overflow issue before plant shutdown initial filler stop but dumper still works), fiberglass (preferred) or poly construction, conical bottom, dome-top tank. All other tanks will have a volume of approximately 5,000 gallons, fiberglass (preferred) or poly construction, flat bottom, dome-top tanks. Table 1 lists the typical connections and other items to be provided on the tanks. Note that the fittings listed include 2-4 spares for future use. Alternative designs may require a different number of type of fittings, vendor proposal shall include a table listing the number and sizes of fittings to provide on each tank. All tanks shall be designed for 1.9 specific gravity use, and fabricated from premium resin (vinyl ester) fiberglass. If necessary, tanks shall also be designed to address any seismic requirements for the specific plant location.

A 3/16” think polypropylene pad shall be placed under each tank.

All tanks shall be equipped with ultrasonic level sensors and mercury-free level float switches as back-up, for automated operation of the Acid Mixing System.

Tanks R-1 through T-7 will be equipped with seal-less mag-drive centrifugal pumps. The pumps shall be utilized to recirculate the acid around the tank and to distribute the acid to the production floor. Motor size shall be sized to deliver 50 gpm of acid to the equipment on the plant floor. The pumps on the Rinse/Reclaim Tanks shall be equipped with basket strainers to protect the pumps and mixing equipment downstream. A basket strainer shall also be installed on the gear drive pumps for the Rinse/Reclaim Tanks. All pumps shall be equipped with flanged flex connectors on the suction and discharge sides of the pumps. Pumps shall include pressure gauges on the pump discharge. Pumps shall be installed on polypropylene stands, elevated so the base of the pump is above of the containment wall on the acid mix room.

Tanks T-1 through T-7 shall each be equipped with pneumatic control valves to automatically control the filling and distribution of acid. Each tank will have one distribution control valve, and a separate feed valve for each acid mixing skid (up to three) being provided. Tank R-1 shall be equipped with up to four (4) pneumatic control valves to automatically control the filling of acid and water. Tank R-1 will also be equipped with a positive displacement air diaphragm pump to manually transfer accumulated solids from the bottom of the tank to the Lead Sulfate Sludge Tank in the Lead Sulfate Recovery Area. All air diaphragm pumps shall include pulsation dampeners.

TABLE 1 – Typical Tank Fittings & Accessories

ITEM TANKS
Tank Number R1 R2 R3 T1-TXX Pasting
Type-Bottom Cone Flat Flat Flat Flat
Service 50% Sulfuric Acid
Temperature, Max. °F 210 210 210 210 210
Pressure Atmospheric
Capacity, gals ~4000 ~5000 ~5000 ~5000 ~5000
Specific Gravity 1.9 1.9 1.9 1.9 1.9
Seismic Zone TBD TBD TBD TBD TBD
Diameter, inches 96 96 96 96 96
Resin/ Construbtion Premium Grade Vinyl Ester Throughout or Poly
Lifting Lugs – 316SS 4 4 4 4 4
Holdown Lugs 316SS 4 4 4 4 4
FRP Ladder/Cages 1 1 1 1 1
24” Dia. Manway 1 1 1 1 1
28” Loose Cover 1 1 1 1 1


5.2.2 Piping

A P&I drawing shall be provided showing all proposed piping. In general, piping runs shall be as follows:

Off-spec acid from each mix skid (separate lines) to tan
0/5000
原始語言: -
目標語言: -
結果 (中文) 1: [復制]
復制成功!
经过验证的冲洗/回收 SG,适当的泵将开始了。在所有饲料的线加上冷却水回路流量传感器必须验证流程或系统将关闭。SG 的混合物将被检查,相比,所需的设置点,那么泵的速度各不相同,因此要实现所需的值。通常 R/R 流量保持不变,酸的流动多种多样的。经过预选的时间段,SG 再被确定和速度进行调整。在调整期间,所有的混合的酸被定向到坦克 R1 的包。当测量的重力内 + /-0.005 所需的值,混的酸是被转移到适当的混合酸的贮槽。应重力漂移所需范围之外、 混的酸改行回到坦克 R1 和系统将继续试图实现所需的值进行调整。系统不应该能够实现所需的值在预选期间,10-15 分钟,系统将关闭,警钟长鸣。系统将继续搅拌直到选定的油箱是满。然后,它将搜索直到找到已达到的另一罐低级别的设置。5.2 收集/分布5.2.1 坦克常规系统通常包括以下的储罐;描述号坦克的冲洗/回收 2-3填补酸 (1.150 SG) 1 2笔芯酸 (低重力 1.320) 1笔芯酸 (中期重力-1.345) 1笔芯酸 (中期-失重-面积 139.0) 1 2粘贴酸 1共 7-10冲洗/回收罐 R1will 是大约 4,000 加仑 (推荐 5000-6000 加仑解决溢出问题之前关闭初始填充停了但翻车机仍然厂),玻璃纤维 (首选) 或聚建设、 锥底、 圆顶油罐。所有其他坦克将有大约 5000 加仑、 玻璃纤维 (首选) 或聚施工、 平底、 圆顶顶端坦克的卷。表 1 列出了典型的连接和其他项目须在坦克上。请注意,列出的配件包括 2-4 备件供将来使用。备选设计可能需要大量不同类型的配件,供应商方案应包括表清单的数量和大小的配件提供关于每一辆坦克。所有的坦克应设计用于 1.9 比重和从溢价树脂 (乙烯基酯) 玻璃纤维制造。如有必要,坦克也应旨在解决特定植物位置任何抗震要求。3/16"认为聚丙烯垫应置于每一辆坦克。应配备所有坦克与超声波液位传感器和无汞水平浮球开关为后盾,为自动化酸混合系统的运作。通过 T-7 坦克 R-1 将配备密封少 mag 驱动离心式泵。应利用泵,来分发坦克周围酸,分发到生产楼酸。电机的大小应大小为工厂设备提供每分钟 50 加仑的酸。对漂洗/回收罐泵应配备篮子过滤器,保护泵和下游的混炼设备。篮子里安装一个过滤器应还在齿轮传动泵冲洗/回收罐。所有的泵须配备泵的吸入和排出两侧法兰的弯管接头。泵应包括对泵的排泄口压力表。泵应安装聚丙烯在架上,升高,因此泵的基础的上面遏制墙壁上酸混合室。通过 T-7 坦克 T-1 应每个配备气动调节阀自动控制充型分布的酸。每个坦克会有一个分布控制阀门,和一个单独的饲料混合防滑 (最多三个) 提供每个酸的阀门。坦克 R-1 应配备达四 4 气动调节阀自动控制的酸和水充填。坦克 R-1 还将配备一种容积式空气隔膜泵,手动将累积的固体从底部的坦克转移到铅的铅硫酸回收地区硫酸污泥池。所有空气隔膜泵应都包括压力缓冲器。表 1 — — 典型的水箱配件及配件项目坦克坦克编号 R1 R2 R3 T1 TXX 粘贴类型-底部锥扁扁扁扁服务 50%硫酸温度、 最大值。° F 210 210 210 210 210大气压力容量,gal ~ 4000 ~ 5000 ~ 5000 ~ 5000 ~ 5000比重 1.9 1.9 1.9 1.9 1.9地震区 TBD TBD TBD TBD TBD直径,英寸 96 96 96 96 96树脂 / Construbtion 特优级乙烯基酯在整个或聚吊耳 — — 316SS 4 4 4 4 4Holdown 派 316SS 4 4 4 4 4玻璃钢梯子或笼子内 1 1 1 1 124"人孔直径 1 1 1 1 128"松盖 1 1 1 1 15.2.2 管道宝洁公司我绘图须显示所有拟议的管道。一般情况下,管道运行应如下所示︰从每个组合防滑 (单独的行),谭 Off 规格酸
正在翻譯中..
結果 (中文) 3:[復制]
復制成功!
验证的清洗/ SG回收后,相应的泵将开始。在所有的进料线加冷却水回路的流量传感器必须验证流量或系统将关闭。这种混合物的SG将被检查,比较理想的设置点,然后水泵的转速相应变化达到预期值。正常的R / R流是保持不变的,酸的流动是变化的。一个预定的时间后,SG再次确定和速度调整。在调整期间,所有的混酸直接装罐R1。当测得的重力是在+ / - 0.005的所需的值,混合酸被转移到适当的混合酸储罐。如果重力漂移在所需的范围内,混合酸将改回油箱R1,和系统将继续在试图达到预期值进行调整。如果系统无法达到预期的值超过预定时间,10-15分钟,系统将关闭并报警,将声音。系统将继续混合,直到选定的坦克充满。它将搜索,直到它找到另一个坦克已经达到了低水平设置。5.2收集/分发5.2.1坦克传统的系统通常包括以下存储池;描述号坦克冲洗/回收2-3补酸(1.150 SG)1-2加酸(低gravity-1.320)1加酸(中gravity-1.345)1加酸(mid-gravity-1.390)1-2粘贴酸1总7-10清洗/回收槽r1will约4000加仑(推荐5000-6000gallon解决溢出问题之前,工厂停工的初始填充停止但翻车机仍然工作),玻璃纤维(首选)或聚施工,锥形底部,穹窿顶罐。所有其他的坦克将有一个约5000加仑的体积,玻璃纤维(优选)或聚建筑,平底,圆顶顶罐。表1列出了在坦克上提供的典型的连接和其他项目。注意配件上市包括2-4备件供将来使用。替代设计可能需要一个不同数量的配件类型,供应商的建议应包括一个表列出的数量和尺寸的配件提供在每一个坦克。所有的坦克都应设计为1.9个特定的重力使用,并从高级树脂(乙烯基酯)玻璃纤维制成。如有必要,坦克也将被设计为解决任何地震的具体工厂位置的要求。一个3 / 16“认为聚丙烯垫应放置在每一个坦克。所有的坦克都配备了超声波液位传感器和无汞水平的浮动开关作为备用,用于自动操作的酸混合系统。坦克R-1通过T-7将配备无密封磁力驱动离心泵。泵应采用循环酸在坦克和分发酸生产车间。电机尺寸大小必须提供50加仑的酸的设备在车间。在冲洗/泵回收罐应配备篮式过滤器保护泵和搅拌设备的下游。一篮式过滤器应安装在冲洗/齿轮传动泵回收罐。所有的泵应配备法兰柔性连接器上的吸、排气侧的泵。泵应包括泵排放的压力表。泵应安装在聚丙烯架上,升高,因此泵的底部是在酸混合室的隔离墙上方。通过将每个坦克T-1 T-7配备气动控制阀自动控制酸的填充和分布。每个罐将有一个分布控制阀,和一个单独的进料阀,每个酸混合打滑(高达三)提供。坦克R-1配备多达四(4)气动控制阀自动控制酸和水填充。坦克R-1也将配备一个容积式隔膜泵手动转移积累的固体从水箱底部的污泥池中的硫酸铅硫酸铅回收区。所有的空气隔膜泵应包括脉动阻尼器。表1 -典型的坦克配件及配件项目库罐号R1 R2 R3 t1-txx粘贴型锥扁扁扁扁扁扁扁扁扁扁扁扁扁扁服务50%硫酸温度,最大华氏210 210 210 210 210大气压能力,女孩~ 4000 ~ ~ ~ ~ 5000 5000 5000 5000比重1.9,1.9,1.9,1.9,1.9地震区待定待定待定直径,英寸96 96 96 96 96树脂/ construbtion优质乙烯基酯或聚在吊耳–316ss 4 4 4 4 44 4 4 4 316ss地角耳4玻璃钢阶梯/笼子1 1 1 1 124“直径。1 1 1 1 1门28“松动盖1 1 1 1 15.2.2管道应提供一个P和I图显示所有建议的管道。一般情况下,管道运行应如下所示:从每个混合酸(分隔线)防滑规格潭
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: