11.3.2 relevant units <br>to change their content should re-examine the system within the unit, device, or whether the mode of operation and therefore lead to changes; timely update "Aspects and Hazards Matrix P1."
11.3.2.Related units<br>The content of the change should be revisited as to whether the system, device or operation within the organization has resulted in a change, and the Aspects and Hazards Matrix P1 should be updated in due course.
11.3.2. Relevant units<br>The system, equipment or operation mode in the unit shall be reexamined in terms of the change content; the "aspects and hazards matrix P1" shall be updated in due time.<br>