Stack operation instructionStack flow chartShift before duty - stacking positioning - stacking control - under the shelf packagingPre job transfer1 pre dressed: (to labor safety helmets, uniforms, shoes, gloves, armguards) attached to the picture with the tools needed to work together (stacking log table, record, tape, seal, flashlight)2 to arrive 15 minutes in advance before conducting the work, understand the production situation, ask the inspection equipment operation and the class production specifications and all kinds of attention, counting apparatus;3 seriously transfer classes, check the health and stacker operation, check the stacker parameters are reasonable;4 seriously transfer the stacking platform number, spare frame (box) and stacking quality, must indicate details on the ticket for traceability.Stacking location1 check spare frame (box) is consistent with the standard rack2 choose stacker type, a total of 4 kinds of frame type, according to the production plan choose frame type, specific operation is as follows:
正在翻譯中..
![](//zhcntimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)