Produced Waters, once processed to specification, are re-injected into their respective (Albian and Miocene) reservoir, with the necessary treated sea water make-up. Water injection into the Miocene reservoir is performed directly through a water injection riser and flowline to the subsea injector wells, while injection to the Albian reservoir is through a water injection transfer line between PLANT and TLP, to dry injector wells on the TLP.