6.3.2 Production related records in the IPQC inspection document, when the station responsible personnel must be indeed filled in and the inspection results of each inspection station will be stamped in the IPQC inspection document, can not be omitted, if there is an omission flow to the next project, then the next project operators should return the product, not accepted.
正在翻譯中..
