• Part Logistics requirements - Logistic sheet
• Logistics sheet should be signed off before Beta prototype is build. (Refer Annexure )
• Packaging should be done in Polythene bag (reusable / recyclable) instead of corrugated box.
• Protective caps should be provided on all ports to avoid dust & water ingress.
• ‘Don’t hold’ instruction sticker should be provided to avoid holding of unit by Delicate parts like Tubes, wires, sensor etc.
• Part handling Recommendation Sheet /Guides to be attached as per application.