The works will be failure after repair, notification device using the unit line / team leader or production supervisor acceptance, acceptance after passing, acceptance in "NWEVII equipment repair and maintenance work report" on the signature confirmation, after a public works supervisor approval archive for future reference.
正在翻譯中..
![](//zhcntimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)