Maintenance procedure every
6 months
Remarks
1. Replace pipettor tube 510
2. Replace pipettor tube 465 with nozzle
seal
3. Replace Pinch Valve Tubing Exchange the pinch tubes every 2months by
coustomer.
4. Replace Pipettor Seals (S/R and sipper)
5.Exchange packings for sipper & pipettor syringe
6. Clean Rinse Station for S/R probe ,Mixer and
Sipper Probe
7. Clean Sipper and S/R probe Clean sipper probe and S/R probe tip with 70%
isopropyl alcohol.
S/R probe only with distilled or deionised
water.
8. Clean water filter main pump
Liquid System
9. Clean System Water Container