CONTENTS1.0 SCOPE OF WORKS 51.1 Codes, Standards and specifications 51.2 Responsibilities 62.0 HEALTH AND SAFETY 73.0 METHODOLOGY AND WORK PROCEDURE 83.1 Preliminaries 83.2 Planning 83.3 Known Services 83.4 Site Preparation 83.5 Rig Anchoring 84.0 PREPARATIONS FOR DRILLING (STEERING TOOLS) 94.1 ParaTrack 94.2 Bottom Hole Assembly 115.0 DRILLING FLUID 125.1 Water Winning System 136.0 PILOT OPERATIONS 137.0 REAMING OPERATIONS 148.0 HOLE CLEANING /SWAB PASS 169.0 PULLBACK OPERATION 1610.0 SITE CLEARANCE 1711.0 EMERGENCY ARRANGEMENTS 1712.0 RECORDS& FORMATS 17