Counterflashings:1. Install new counterflashings under equipment housing flanges and new receivers along rise or parapet walls.2. Secure counterflashing at 150mm (6-inches) on-center with self-tapping screws.3. Saw cut new reglet in existing substrate and install new receiver. Secure new receiver in place with appropriate fasteners spaced 300mm (12-inches) on-center. Apply a continuous bead of sealant, Type B, along top edge of receiver/reglet.4. Lap adjacent sections of receivers and counterflashings a minimum of 100mm (4-inches). Apply a continuous bead of sealant, Type B, in lap.5. Trim existing counterflashing to receive new flashing. Secure new flashing to receiver utilizing self-tapping screws spaced 150mm (6-inches) on-center.6. Install wind clips to termination bar spaced 600mm (24-inches) on-center.