The hotel uses geothermal energy to provide hot water for the hotel. System operation priority geothermal energy, but in order to ensure the normal operation of the five-star hotel, but also consider when troubleshooting geothermal wells with a conventional device as a backup. Geothermal energy as a clean energy, it must be scientific exploitation. Integrated operation of these energy-saving projects provides us with heating and domestic hot water, it can replace the original boiler plus air-conditioning systems in order to save energy.
The hotel uses geothermal energy to provide hot water for the hotel. System operation priority use of geothermal energy, but in order to ensure the normal operation of the five star hotels, but also to consider the use of geothermal wells in the fault maintenance of conventional equipment as a backup. Geothermal energy as a clean energy, we must carry out scientific development and utilization. The integrated operation of these energy saving projects provides us with heating and living hot water, which can replace the original boiler and air conditioning system in order to achieve the purpose of energy saving.