A) according to our file publishing program and schedule requirements, although flow chart content did not change, but still need to publishing the second phase of the manual system) has I) VCL systems equipment are security level
2) refer to the new version of the process graph
III) outdoor pollution of the air after the emergency line processing, radioactive pollutant concentration has greatly reduced, achieve the personnel can accept the dose value, while the VCL system wind tube is seismic and wind pipe is air tightness of, so there is no need to set the chilled water coil
on the emergency line