This technology is applicable to industrial and civil buildings in the cast-in-place reinforced concrete structure with diameter of 14 ~ 1 grade 40mm in the vertical position, horizontal position butt
or inclined position connection. When the two bar diameter is not at the same time, can also be used in gas pressure welding connection, but the two diameter difference of not more than 7mm. 2 preparation of construction materials and equipment to the main 2.1
; 2.1.1 steel: steel grade, diameter must meet the design requirements, have merchandisecertification and retest report. Imports of steel should have the chemical re single, the chemical
sub should meet the welding requirements, and should solderability test. 2.1.2 oxygen (O2):Gas pressure welding with oxygen purity should be above 99.5%, can meet the quality requirements of class I or II
GB3863 class technology. Acetylene gas 2.1.3 (C2H2): the best use of bottled acetylene, quality must comply with the requirements of GB6819