⑹ drilling to design requirements:
based on test piles construction experience, this site mud slurry leakage situation is more prominent, wet hole, except in special circumstances, are used to cover clay mud or throw the ball back, got into the design when the pile bottom elevation , after the total package and the supervising engineer inspection hole can terminate drilling, place a positive spin a few laps, then stopped, lifting drill pipe. Conduct a clean hole.