here is no path forward in the response we have received from you. As such we will proceed with releasing the attached foundation drawings tomorrow. We need to know where the gap needs to be and how the CP anodes will be installed to have an idea if the foundation needs to be raised in elevation (resulting in raising the tank height....very expensive option) or does it need to get deeper. We do not want future foundation design changes to impact your construction schedule or result in additional cost to SPS.