Chapter 5 Maintenance and Troubleshooting
5.1 Protective Maintenance
The preventative maintains should be taken by our authorized staff.
5.2 Daily maintenance
1) Clean the handpieces: Well clean with warm towel after each treatment;
2) Check water level: Every while after the equipment is used, check water level and make
sure water volume is above the minimum level;
3) Clean the equipment with a soft damp cloth. A mild detergent could be used but be
cautious as not to let liquids from entering the unit’s internal mechanism;
5.3 To Change Seal Ring of Freeze Sculpting Handpiece
1) The connection part of handpiece has seal rings;
2) The treatment head of handpiece has seal rings;
3) The sizes of sealing ring of the handpiece are different;
4) Check whether the sealing ring has air leakage;
5) If there is air leakage, you shall use the new seal ring;
6) The procedures are as below:
○1 Discharge the handpiece from the equipment;
○2 Take down the seal ring;
○3 Put on the new seal ring;
○4 Install the handpiece;