The CONTRACTOR shall carry out the fire fighting system, which combined with the living water distribution network (raw water) and raw water tank . The fire fighting system shall be designed, procured,constructed, completed and run by CONTRACTOR based on the approved drawings,NFPA5000 and other related codes and standard. Two fire fighting pumps with relative accessory facilities shall be installed at the water supply & treatment station.