Hello all,
As agreed, the LG resin can be arranged to the trail in next Monday. Following is the agenda for the
1. Take a look at the tool, machine(which m/c is dedicated)
2. Take away the tool to mold maintenance room, open up, disassemble, clean up tool components, and check tool condition
3. Check molding M/C condition &open up the barrel and screw, check condition and clean up them as needed.
4. Clean up the resin drier, and check drier and pipes condition
5. Bring the resin to drier
6. Install barrel & screw, tool
7. Set up molding process
8. Production (C type 75Kg and B type 25Kg)
From Nokia side, Eunbo Shim, Holly Hui and I will go to support this trail. Mika, please join us if you are available in next Monday.
@Eunbo, please support to get LG material on board at Nolato in this Friday for their internal arrangement. Thanks!
Hello all,
As agreed, the LG resin can be arranged to the trail in next Monday. Following is the agenda for the
1. Take a look at the tool, machine(which m/c is dedicated)
2. Take away the tool to mold maintenance room, open up, disassemble, clean up tool components, and check tool condition
3. Check molding M/C condition &open up the barrel and screw, check condition and clean up them as needed.
4. Clean up the resin drier, and check drier and pipes condition
5. Bring the resin to drier
6. Install barrel & screw, tool
7. Set up molding process
8. Production (C type 75Kg and B type 25Kg)
From Nokia side, Eunbo Shim, Holly Hui and I will go to support this trail. Mika, please join us if you are available in next Monday.
@Eunbo, please support to get LG material on board at Nolato in this Friday for their internal arrangement. Thanks!