The Contractor shall develop and maintain a PQP, the plan shall be available to the Employer according to the timeline defined in Clause 4.1 [Documentation] of this document.Content in the PQP, which will be updated on regular basis during the Project. Updates can be included in the PQP as appendix’ and can be updated separately following Sub-Clause 7.1.2 [Control of Documentation] of this document.The PQP shall include a general description of the Product and/or the Works and as a minimum include the following: