In carrying out the various stages of the change operation, the supervisor of the change operation shall monitor and perform the environmental inspection work, and the environmental management personnel shall conduct on-site audits on a regular/irregular basis. The status of the inspection or audit shall be carried out in accordance with the provisions of the Environmental Performance Measurement and Supervision and Management Procedure.
正在翻譯中..
![](//zhcntimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)