2.2 The capacity of the system should be designed to meet the average and the
peak flow demand of the current operation. If necessary, depending on planned
future demands, the system should be designed to permit increases in the capacity
or designed to permit modification. All systems, regardless of their size and
capacity, should have appropriate recirculation and turnover to assure the system
is well controlled chemically and microbiologically.