2.2 烟道系统阻力计算及分析通过计算可知,5#单独运行时,各段阻力中,引风机出口至吸收塔入口段的烟道阻力最高,其次为除尘器出口至引风机入口的英文翻譯

2.2 烟道系统阻力计算及分析通过计算可知,5#单独运行时,各段阻力中

2.2 烟道系统阻力计算及分析
通过计算可知,5#单独运行时,各段阻力中,引风机出口至吸收塔入口段的烟道阻力最高,其次为除尘器出口至引风机入口段阻力。#6炉各段阻力中最大值与#5炉各段阻力中最大值位于同一位置,均在引风机出口至吸收塔入口段的烟道。同时,#6炉改造前该位置设有一台半干法脱硫设备,脱硫改造后充当烟道使用,因此,在对其结构进行优化也应从此方面考虑。
0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!
2.2 resistance calculation and analysis of flue systemThrough calculation, 5# when running alone, in the resistance, induced draft fan outlet flue highest resistance to absorption tower entrance, followed by the filter outlet to the fan inlet resistance. #6 boiler resistance maximum values with #5 furnace resistance maximum values are in the same position, fan flue exported to the Tower entrance. Meanwhile, #6 the location before the furnace with a semi-dry flue gas desulfurization equipment, as after desulfurization flue used, therefore, to optimize its structure should also be considered.
正在翻譯中..
結果 (英文) 2:[復制]
復制成功!
2.2 Calculation and analysis of the flue system resistance
by calculation, # 5 separate operation, the resistance of each segment, the induced draft fan flue outlet to the highest resistance to absorber inlet section, followed by exports to the induced draft fan precipitator inlet section resistance. # 6 paragraphs furnace resistance furnace # 5 and the maximum value of each segment resistance maximum value at the same location in both the induced draft fan flue outlet to the inlet section of absorption tower. Meanwhile, the front of the Furnace # 6 position with a semi-dry desulphurization equipment, the use of flue gas desulfurization modified to serve, therefore, to optimize its structure should also be considered from this aspect.
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!
2.2 flue system resistance calculation and analysisBy calculation, 5# separate operation, pressure, fan outlet to absorption tower entrance flue resistance is highest, followed by the dust outlet to fan entrance section resistance. The maximum pressure of #6 furnace and #5 furnace pressure in the maximum value in the same location, both in the flue fan exit to the entrance section of the absorption tower. At the same time, #6 furnace before the transformation of the location with a semi dry desulfurization equipment, desulfurization transformation as a flue, therefore, in the optimization of its structure should also be considered from this aspect.
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.