With the result of the 19-20/05 sample drilling results collation with tight Team test results, the intensity Test drill sample, pressed split 7 days for each class construction contractor noticed. The single layer drilling pattern is consistent in terms of tightening, quality CBGM collation with the project's technical requirements is satisfactory
正在翻譯中..