Adjust 5 factories (including 3 factories, 1 raw material warehouse and 1 finished product warehouse), 2 offices; addition of 1 specialist motel; Adjustment of production machinery and equipment: 11 sprayers, 3 paint rollers, 2 boilers (3 tons/ h and 7 tons / h), 4 vacuum dryers, 20 small mixing tanks, 16 test sprayers and leather finishing machines; Change the type of skin soaking chemical (2nd soaking); change oil-based paint to water-based paint (rolling and spraying); Adjustment of exhaust treatment system includes: boiler treatment system 3 tons / h and 7 tons / h, no treatment system for paint rolling, installation of air suction system spread out through exhaust pipes for spraying paint