6.4.機會與方案:各項內容經評分鑑別出風險等級後,對於高度風險之作業應依『目標、機會與方案管理程序』執行方案改善並評估其成效。各部門對於中的英文翻譯

6.4.機會與方案:各項內容經評分鑑別出風險等級後,對於高度風險之作業

6.4.機會與方案:各項內容經評分鑑別出風險等級後,對於高度風險之作業應依『目標、機會與方案管理程序』執行方案改善並評估其成效。各部門對於中、低風險作業仍應視可行性進行改善或制定方案,並納入日常管理運作。6.5.紀錄保存:各部門Aspects and Hazards Matrix P1表單及傳簽紀錄將由各推動小組成員執行及保存,副本交予ESH單位備查。6.6.監督量測:Aspects and Hazards Matrix P1表單執行狀況將與環安衛管審會議上一併討論之。6.7.Aspects and Hazards Matrix P1表單
0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!
6.4 opportunities and programs: the various elements of the level of risk identified by the score, for high risk operations should be in accordance with the "target, opportunities and program management procedures" to improve the implementation of the program and assess its effectiveness. For each sector, the job should still be low risk, as the feasibility of improving or developing programs and management into their daily operations. <br>6.5 record keeping: each department Aspects and Hazards Matrix P1 forms and record the circular signed by the members of the group to promote the implementation and preservation, handed over a copy of ESH units for future reference. <br>6.6 Supervision measurement:. Aspects and Hazards Matrix P1 form of the status of implementation will be discussed together with the trial of ESH meeting. <br>6.7.Aspects and Hazards Matrix P1 Form
正在翻譯中..
結果 (英文) 2:[復制]
復制成功!
6.4. Opportunities and Programmes: Once the content has been graded for risk, the implementation of the high risk operation should be improved and evaluated in accordance with the Objectives, Opportunities and Programme Management Procedures. Departments should still improve or develop programmes for medium- and low-risk operations, depending on feasibility, and incorporate them into day-to-day management operations.<br>6.5. Record-keeping: The Aspects and Hazards Matrix P1 forms and signature records of each department will be executed and saved by the members of the push team, and copies will be submitted to the ESH unit for reference.<br>6.6. Monitoring measures: Aspects and Hazards Matrix P1 form implementation will be discussed in parallel with the CIRC meeting.<br>6.7.Aspects and Hazards Matrix P1 Form
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!
6.4. Opportunities and plans: after the risk level of each content is identified by scoring, the high-risk operation shall be improved and evaluated in accordance with the management procedure for objectives, opportunities and plans. All departments shall improve or make plans for medium and low-risk operations according to the feasibility and incorporate them into daily management and operation.<br>6.5. Record keeping: the aspects and hazards matrix P1 form and signature transfer record of each department will be executed and kept by members of each promotion team, and the copy will be submitted to ESH unit for reference.<br>6.6. Supervision and measurement: the implementation status of aspects and hazards matrix P1 will be discussed together with the environmental safety management review meeting.<br>6.7. Aspects and hazards matrix P1 form<br>
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: