12.2.2 As its own responsibility, the Locator should take out insurance cover for its own property in TSEZ-A (including TSEZ-A property) in respect of loss and liability risks. The Locator shall provide MJTD with a copy of such insurance policies if MJTD request the same. In addition, the Locator shall, at its sole expense, purchase and maintain insurance policies for all kinds of property in TSEZ-A which may be affected by construction works as reasonably required by MJTD at all times.
12.2.3 No excavation shall be made except in connection with the approved construction of the Improvements and, upon completion thereof, exposed openings shall immediately be backfilled and leveled. Any kind of excavation work in the buffer zone as specified in Article 1.15 must have the prior approval from MJTD and with MJTD's supervision during the work. Excavation work in buffer zone must be done by the Locator using manual labor or by other methods provided that the Locator shall exercise due care not to damage the underground utilities when undertaking such excavation work. The Locator shall compensate MJTD for any damages or losses to the underground utilities of MJTD arising from the excavation works on the part of the Locator or its employees/agents.