The Mini-Fab has been selected as it captures the challenges
involved in scheduling the highly re-entrant semiconductor manufacturing lines. A number of scenarios have been developed and are used to evaluate the effect of different dispatching rules and lot release policies on the selected performance measures. Results of simulation showed that the performance of the Mini-Fab can be drastically improved using a combination of dispatching rules and lot release policy.