On the following days ,our engineering need to clean and change the water inside air conditioning system freeze water pipe .And they need to replace and repair the valve and exhaust . It will take 2 days and AC will not work during the working time .
Besides,Before the boiler is put into operation, the boiler should be carried out once cooking stove for boiler running under high temperature of 95 degrees within the pipeline and boiler (reason we do because with high temperature to remove dirt and rust). This work need also take for 2days .During the time will no hotel water available for service .
We plan to combine these two tasks at the same time. In order to avoid affecting the guest's stay experience .So I apply to close booking channel for Novotel from Aug 29 -31.Kindly for your approval!
Cheers