⑶钻机就位:钻机下铺钢板,以保证在施工过程中钻机稳定性,靠近钻孔位并将钻头中心直接对准钻位中心,再精确调整机架的垂直度后,将钻头精确定位。⑷的英文翻譯

⑶钻机就位:钻机下铺钢板,以保证在施工过程中钻机稳定性,靠近钻孔位并将

⑶钻机就位:
钻机下铺钢板,以保证在施工过程中钻机稳定性,靠近钻孔位并将钻头中心直接对准钻位中心,再精确调整机架的垂直度后,将钻头精确定位。
⑷压入钢护筒:
利用钻机专用卡具将底节钢护筒卡放在已钻2~3m的成孔中,利用挖机压入钢护筒。护筒采用约20mm厚的钢板制作,内径约1010mm左右。护筒每节长2.0~3.0m。另外,为了便于灌注砼时泥浆外排,在护筒顶端预留2个开口为40×20cm的出浆口。
0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!
⑶ rigs in place:Drilling machine lower plate, in order to ensure stability of the rig during construction near the drill bit drill bit and drill Center directly at Center, after more accurately adjust the squareness of the frame, pull the bit accurately.D onto the steel casing:Rig special clamps to the end of section steel casings in drill 2~3M hole, using digging machines into the steel casing. About 20mm thick steel plate casing, diameter of about 1010mm. Each section longer 2.0~3.0M the casing. In addition, in order to facilitate pouring concrete slurry discharged when, in the top of the casing set aside 2 openings for stock outlet 40x20cm.
正在翻譯中..
結果 (英文) 2:[復制]
復制成功!
⑶ rig in place:
rig steel bunk beds, in order to ensure the stability of the rig in the construction process, drill bit and drill close to the center directly at the center of the drill bit, and then fine-tune the verticality of the rack, the precise positioning of the drill.
⑷ pressed into the steel casing:
the use of special fixtures will rig the bottom section of the steel casing have been drilled into the hole on the card 2 ~ 3m, the use of digging machine pressed into the steel casing. Casings using about 20mm thick steel plate, diameter of about 1010mm or so. Casings for each section length 2.0 ~ 3.0m. Further, in order to facilitate concrete perfusion mud efflux in the casing top reserve two openings 40 × 20cm of the stock inlet.
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!
The driller:The verticality of the rig lower plate to ensure in the construction process of drilling rig stability, near the drill bit and drill center aimed directly at the center position of the drill, and precise adjusting frame, the accurate positioning of the drill bit.The pressure into the steel tube:The use of drilling special fixture will bottom section steel tube card in 2 ~ 3M have been drilled into the hole, pressed into the steel tube by digging machine. The tube is made of steel plate with about 20mm thick, and the inner diameter is about 1010mm. 2 ~ 3.0m of each segment length of the protecting tube. In addition, in order to facilitate the discharge of mud outside the mud, in the top of the retaining tube set aside 2 openings for the 40 x 20cm of the pulp outlet.
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: