The driller:The verticality of the rig lower plate to ensure in the construction process of drilling rig stability, near the drill bit and drill center aimed directly at the center position of the drill, and precise adjusting frame, the accurate positioning of the drill bit.The pressure into the steel tube:The use of drilling special fixture will bottom section steel tube card in 2 ~ 3M have been drilled into the hole, pressed into the steel tube by digging machine. The tube is made of steel plate with about 20mm thick, and the inner diameter is about 1010mm. 2 ~ 3.0m of each segment length of the protecting tube. In addition, in order to facilitate the discharge of mud outside the mud, in the top of the retaining tube set aside 2 openings for the 40 x 20cm of the pulp outlet.