An unfavorable production-volume variance measures the cost of unused capacity.Production at capacity would result in a production-volume variance of zero because the fixedoverhead rate is based on expected hours at capacity production. However, the existence of anunfavorable volume variance does not necessarily imply that management is doing a poor job orincurring unnecessary costs.