(9): concrete pouring concrete pouring with water plug (sealing ball), guarantee the quality of concrete pouring.EquipmentCatheter: bottom diameter 219 3.5m lengthThe middle diameter length of 219 2.5m * nThe upper diameter length of 219 1m * n+0.5m * nHopper: Volume 1 cubic metersThe calculation of continuous injection of the first time concreteAfter the first time of continuous pouring of concrete, the depth of the buried pipe must be guaranteed at least 1m.The least amount of the first continuous perfusion was calculated as follows (in the case of the effective length 27m, the hole depth 34m):