3.2 gas filter and pipeline pressure relief operation steps1) Notice MCC and CPF, the first station for gas pipeline nitrogen purge and drainage;2) confirm the 2# filter (1# filter outlet valve 0393 open 0391);3 H0301, H0302) confirm the heating furnace and reserved heating furnace H0303 intake valve closed;4) station closed in 0172, the main valve inlet valve 0392 1# filter (2# filter 0394);5) manually slowly open 3# reserved heating furnace air intake valve (2 "ball valve), observe and record the collection of fluid collection;Combustible gas detection in the field, 6;7) to be out of the liquid to stop, to retain partial positive pressure, closed 3# set aside the heating furnace intake valve;8) slow 2# filter (1# filter) blowdown valve, observe the pressure gauge PG0392 (PG0391) instructions, retain partial positive pressure, close the valve;9) slowly opening the residual liquid tank blowdown valve, PG0393 indicator, retained partial positive pressure valve;Combustible gas detection in the field, 10;11) pressure relief;
正在翻譯中..
![](//zhcntimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)