The temporary dock of central contractor is still in operation, HTC contractor has not been able to close the piles C15, C16, C17, C18, C19. By 15/01/2021 HTC contractors will construction these piles should ask the investor to have a plan to exchange with central contractors to hand over the full water to the contractor.