CONTENTS1.0 SCOPE OF WORKS 51.1 Codes, Standards and specifications 51.2 Responsibilities 52.0 HEALTH AND SAFETY 63.0 METHODOLOGY AND WORK PROCEDURE 73.1 Preliminaries 73.2 Planning 73.3 Known Services 73.4 Site Preparation 73.5 Rig Anchoring 74.0 PREPARATIONS FOR DRILLING (STEERING TOOLS) 84.1 ParaTrack 84.2 Bottom Hole Assembly 95.0 DRILLING FLUID 105.1 Water Winning System 116.0 PILOT OPERATIONS 117.0 REAMING OPERATIONS 128.0 HOLE CLEANING /SWAB PASS 149.0 PULLBACK OPERATION 1410.0 SITE CLEARANCE 1511.0 EMERGENCY ARRANGEMENTS 1512.0 RECORDS& FORMATS 15