Really is not at all wasted time, the 8th order, you control system air 12 hours, after I let factory tested well, and then sent to the logistics side, the logistics do a single day, the next day sent to UPS , that is, there is a single number appeared on the 11th, and is now waiting for clearance.
正在翻譯中..