The product is multi-chip , the starting point need on (37 , -3) after you setup,or it will be shift.if the starting point isn't (37 , -3), you need to datain on (37 , -3).Site1 in the upper left and site 8 in the lower right will be fail as regards BIN 2 is a natural.Site 5.6.7 will be FAIL as regards BIN13 is a natural .Customer explain that don't need to stop if BIN13 fail.