If the manufacturer confirms that the equipment and communication equipment must not be repaired or the contractor evaluates that the repair is not cost-effective
If the manufacturer confirms that the equipment communication equipment must not be unable to repair or the contractor to assess the cost-effectiveness of maintenance
If the equipment and communication equipment are confirmed by the manufacturer, they shall not be unable to be repaired or the undertaker shall evaluate the cost-effectiveness of the repair<br>