Proof of Concept Agreement
THIS AGREEMENT (the “Agreement”) signed on (insert date)
(“Effective Date”) by:
REDtone Telecommunications SDN BHD, a company duly organized
and existing under the laws of Malaysia (with registration number xxxxxxx),
having its registered place of business at Suite 22-30, 5th Floor, 101 Business
Park, 47000 Puchong Selangor, Malaysia
And,
CHEM FUEL CELL (M) SDN BHD, a company registered under the laws
of Malaysia with its principal place of business at No.33, Jalan 6/118C, Desa
Tun Razak, 58000 Kuala Lumpur, Malaysia
REDtone Telecommunications SDN BHD and CHEM FUEL CELL (M)
SDN BHD are referred to individually as “Party” and collectively as
“Parties”
RECITALS
WHEREAS, REDtone Telecommunications Sdn. Bhd., an integrated
telecommunications service provider catering to niche market segments.
REDtone has evolved from a voice provider to one that offers an extensive
range of services under 4 main categories namely; Telecommunications
Service, Managed Telecommunications Network Services, Managed Value
Added Services, and Mobile Services;
WHEREAS, CHEM FUEL CELL (M) SDN BHD (CHEM (M)), desires to
provide a proof of concept (POC) for the fuel cell, ME2Power Supply
System running with Methanol water and with the terms and conditions as
stated in this agreement.
WHEREAS, REDtone (REDtone) desires to conduct actual demonstration
(“Demo”) of ME2 POWER SYSTEM (“Equipment”) to provide renewable
energy source for its existing base transceiver station (“BTS”) at (…) site
(“Demo Site”);
WHEREAS, REDtone has selected CHEM FUEL CELL (M) SDN BHD to
conduct an equipment demonstration of its Equipment, for a period of thirty
(30) calendar days upon complete installation and commissioning of
Equipment at the Demo Site;
NOW THEREFORE, in consideration of the mutual covenants and
provisions contained herein, the Parties agree as follows:
1. Scope of Works and Responsibilities of Each Party
1.1 Responsibilities of the CHEM FUEL CELL (M) SDN BHD
1.1.1 The supply of the Equipment for demo purpose. The detailed
specification of the ME2 Power Supply System is attached in ANNEX
A: Detailed Specification of ME2 Power System.
1.1.2 To provide installation and commissioning of Equipment at REDtone
Demo Site.
1.1.3 To integrate all necessary equipment to conduct the agreed upon
Acceptance Test Procedure as attached in ANNEX D: Acceptance
Test Procedure for POC.
1.1.4 Dispatch its expert personnel to site to set up and activate the
equipment.
1.1.5 Provide project management support for orderly execution.
1.1.6 Provide qualified technical personnel to operate, log and monitor fuel
cell demo unit for a period of thirty (30) calendar days.
1.1.7 Ensure has no equipment and system or property of REDtone is
damaged or adversely affected as a result of this Demo activity.
1.1.8 Ensures that at its own full expense the proposed ME2 power supply
system shall not in any way affect REDtone network during installation
and the conduct of the Demo activity.
1.1.9 Ensure that the system, and software it supplies poses no safety
hazards to REDtone operation staff, its customers or any other persons.
1.1.10 Bears the cost of operation of the system, including the refueling cost
and the supplied Equipment during the period of the demo.
1.1.11 Inspect to ensure the integrity of the existing grounding system where
the equipment grounding will be connected.
1.2 Responsibilities of REDtone
1.2.1 Provision of site facilities such as sufficient space and proper site
grounding system were in place on site.
1.2.2 Assist in the provision of all supporting documents for CHEM FUEL
CELL (M) SDN BHD to obtain the required permits if needed for the
installation of the equipment, and pay for any incidental permit cost
and fees.
1.2.3 REDtone shall grant site access to CHEM FUEL CELL (M) SDN BHD
for installation, maintenance and other activities related to the
operation of the demo.
1.2.4 Except for the willful acts or omissions of REDtone personnel,
REDtone shall not be liable for any loss or damage to the
equipment/system during the demonstration period.
1.2.5 REDtone to assist with provision of an onsite facilities engineer or
technician during the installation and setting up of the equipment to
provide supervision as CHEM FUEL CELL (M) SDN BHD may need
REDtone’s assistance in identifying the existing grounding loop where
the equipment grounding should be connected.
1.2.6 REDtone shall provide personnel to accompany personnel from CHEM
FUEL CELL (M) SDN BHD for the commissioning and Acceptance Test
Procedure (ATP).
2 Terms and Conditions
2.1 The maximum power consumption of Equipment for each site shall not
exceed 2.5 kW.
2.2 Demo Period
The demonstration period shall be thirty (30) calendar days
commencing from CHEM FUEL CELL (M) SDN BHD written notice of
the completion of installation of the equipment.
2.2.1 The Demo Equipment shall be installed in REDtone BTS site located at
(…), free of charge for occupancy, which CHEM FUEL CELL (M) SDN
BHD will design based on the cell site requirements and specifications.
2.2.2 In the event that the said equipment and materials are functioning
properly and met the cell site requirements and specifications as well as
satisfy REDtone technical and commercial expectations (as attached in
ANNEX D: Acceptance Test Procedure for POC) within one
months (1 months) then REDtone agrees with CHEM FUEL CELL (M)
SDN BHD for a Commercial Deployment of total 39 sites shall be
immediately becomes effective per the quotation submitted as attached
in ANNEX C: Commercial Deployment Quotation.
2.2.3 Failure of CHEM FUEL CELL (M) SDN BHD to provide concrete result
based on agreed technical and commercial parameters, REDtone shall
assist in the removal and returning process of the Equipment to CHEM
FUEL CELL (M) SDN BHD without any charges.
2.2.4 Subsequent to the effective of REDtone enter into Commercial
Deployment agreement of the ME2 POWER SUPPLY SYSTEM to
CHEM FUEL CELL (M) SDN BHD, CHEM (M) are responsible for the
after sales support and warranty within the period of five (5) years from
the date of acceptance.
2.2.5 Payment shall be made in accordance to terms & conditions in
ANNEX B: Proof of Concept Quotation.
2.2.6 Ownership of equipment shall remain with CHEM FUEL CELL (M)
SDN BHD during and after the demo period.
2.3 Test Equipment
CHEM FUEL CELL (M) SDN BHD shall supply all testing instruments
and special tools to perform the demo, which are to be mutually agreed
by REDtone and CHEM FUEL CELL (M) SDN BHD prior to the
commencement of the demo. All such testing instrument and tools
shall remain the property of CHEM FUEL CELL (M) SDN BHD
2.4 CHEM has the right to change the specifications of the Equipment
without any prior notice to REDtone.
3 Price, Invoicing, Terms of Payment and Payment Schedule
3.1 If REDtone agrees to enter the commercial deployment, REDtone shall
pay the down payment in advance for project initiation to CHEM FUEL
CELL (M) SDN BHD as attached in ANNEX C: Commercial
Deployment Quotation.
3.2 REDtone shall pay CHEM FUEL CELL (M) SDN BHD for the
Equipment Leasing and Managed Energy Services supplied for 39 sites.
3.3 REDtone shall pay CHEM FUEL CELL (M) SDN BHD for the
Equipment Leasing and Managed Energy Services every quarter in
advance after the Acceptance Test Procedure for Commercial
Deployment as attached in ANNEX F: Acceptance Test Procedure
for Commercial Deployment (includes: Pre-Installation Site
Information Checklist, ME2POWER System Setup Checklist,
ME2POWER System Parameter Check List, ME2POWER Operation
Checklist and Remote communication test).
3.4 CHEM FUEL CELL (M) SDN BHD shall agree to provide Service Level
as attached in ANNEX E: Service Level.
IN WITNESS WHEREOF, the Parties hereto have executed this Agreement
through their respective authorized representatives as of the date written
above.
REDtone Telecommunications
SDN. BHD.
CHEM FUEL CELL (M) SDN
BHD
BY: ______________________ BY: ______________________
ANNEXES:
ANNEX A: Detailed Specification of ME2 Power System
ANNEX B: Proof of Concept Quotation
ANNEX C: Commercial Deployment Quotation
ANNEX D: Acceptance Test Procedure for POC
ANNEX E: Service Level
ANNEX F. Acceptance Test Procedure for Commercial Deployment
Annex A. Detailed Specification of ME2 Power Supply System
Rated Power 5kW
Operating Load 2.5kW
Voltage 48V DC
Voltage range 48~56V DC
Size (L*W*H) 1.35 X 1.15 X 1.76m
Case Material Aluminum Alloy
Weight (Fuel not
included)
295kg
Fuel Methanol water (ME
Plus)
Fuel Tank Capacity 225 L(±193kg)
Operating ambient
temperature
Standard type -5 ~ 46°C
Communication SNMPv2c, dry contact
and optional wireless
monitoring
Standard
Certification
CE, ANSI/CSA FC-1,
Telcordia GR-63-CORE
Seismic Zone 4
Operation time
(225L fuel tank)
2kW output rate 100 hrs,
or 5kW output rate 40
hrs
Noise index
概念協定證明本協定 ("協定") 簽訂 (插入日期)("生效日期") 的:REDtone 電信 SDN BHD,正式組織公司和現有根據馬來西亞法律 (與登記號碼 xxxxxxx),在套房 22-30,5 樓 101 業務及其註冊營業地點公園,47000 蒲種雪蘭莪州馬來西亞,化學燃料電池 (M) SDN BHD,根據法律註冊的公司其主要營業地點的 33 號,Jalan 6/118 C、 經社部在馬來西亞的敦拉薩,58000 吉隆坡馬來西亞REDtone 電信 SDN BHD 和化學燃料細胞 (M)SDN BHD 單獨稱為"一方",統稱為"締約方"演奏會鑒於,REDtone 電信爰,綜合電信服務提供者餐飲利基市場區隔。REDtone 已從語音供應商之一,提供廣泛各種服務以下 4 個主要類別即;電信服務,託管電信網路服務,託管的值增值的服務和移動通訊服務;而化學燃料細胞 (M) SDN BHD (CHEM (M)) 的渴望燃料電池,ME2Power 供應提供證明的概念 (POC)系統運行甲醇水和條款與條件本協定所述。而 REDtone (REDtone) 的欲望進行實際示範("Demo") 的 ME2 電力系統 ("設備"),提供可再生能源為其現有基站收發信台 ("輸血服務中心") 遺址 (......) 的("演示網站");而 REDtone 已選化學燃料細胞 (M) SDN BHD 向進行其設備,為期三十裝備論證(30) 個日曆日內完成安裝和調試在該演示網站; 設備因此,考慮到相互之間的約定和本協定所載的規定,各方達成協議如下:1.工程規模和各方的責任1.1 化學燃料電池 (M) SDN BHD 責任1.1.1 為演示目的設備供應。詳細ME2 電力供應系統的規格已附在附件答: 詳細規範 ME2 電力系統。1.1.2 提供安裝和調試設備,REDtone演示網站。1.1.3 對整合所有必要的設備進行商定後接受度測試程式所附附件 d: 接受POC 的試驗程式。1.1.4 派遣其專家的人員到現場設置和啟動設備。1.1.5 為有序執行提供專案管理支援。1.1.6 提供合格的技術人員操作,日誌和監視燃料儲存格示範單位,為期三十 30 個日曆日。1.1.7 確保並無任何裝備和系統或 REDtone 屬性是損壞或由於此演示活動產生不利影響。1.1.8 確保在其自身全部費用建議 ME2 供電電源系統應不影響 REDtone 的網路,在安裝過程中和演示活動的行為。1.1.9 保證的系統和它提供的軟體構成不安全REDtone 操作人員,其客戶或任何其他人的危險。1.1.10 承擔操作的系統,包括加油成本的費用和在演示期間提供的設備。1.1.11 檢查,以確保現有的接地系統的完整性在哪裡將連接設備接地。1.2 REDtone 職責1.2.1 提供足夠的空間和適當的地點等網站設施接地系統在網站上的地方。1.2.2 協助在為化學燃料提供的所有證明檔細胞 (M) SDN BHD,以獲得所需許可證如果需要安裝的設備,並支付任何附帶的許可證成本和費用。1.2.3 REDtone 應為化學燃料電池 (M) SDN BHD 授予網站存取權限安裝,維修和其它活動有關演示操作。1.2.4 除外的故意行為或遺漏 REDtone 人員,REDtone 任何損失或損壞概不負責系統在演示期間。1.2.5 REDtone 協助提供現場設施工程師或在安裝和設置的設備技術員因為化學燃料電池 (M) SDN BHD 可能需要提供監督REDtone 的協助確定現有的接地回路在哪裡應連接設備接地。1.2.6 REDtone 應提供人員,陪同人員從化學燃料電池 (M) SDN BHD 的調試和驗收試驗(ATP) 的過程。2 條款及條件2.1 為每個網站的設備最大功耗不得超過 2.5 千瓦。2.2 演示期間示威期間應為三十 30 日曆天從化學燃料電池 (M) SDN BHD 書面聲明的開始設備安裝完成。2.2.1 演示設備應安裝在 REDtone BTS 網站位於(......),免費入住,其中化學燃料電池 (M) SDNBHD 將設計基於細胞網站要求和規範。2.2.2 的事件中說的設備和材料的功能適當地滿足細胞網站要求和規格,以及(所附在滿足 REDtone 技術和商業的期望附件 d: 接受度測試程式的 POC) 內其中一個個月 (1 個月) 然後 REDtone 同意與化學燃料電池 (M)總 39 網站商業部署的 SDN BHD 應馬上就會成為有效每提交所附的報價在附件 c: 商業部署報價。2.2.3 化學燃料電池 (M) SDN BHD 未能提供具體的結果基於商定的技術和商業參數,REDtone 應協助的去除和返回的過程對化工設備燃料電池 (M) SDN BHD 未經任何指控。2.2.4 以後到 REDtone 的有效進入商業ME2 電力供應系統的部署達成協議化學燃料電池 (M) SDN BHD,化工 (M) 是負責售後支援和保修從五個 5 年的期限內驗收的日期。2.2.5 付款應按照的條款及條件附件 b: 證明的概念報價。2.2.6 擁有權的設備應保持與化學燃料電池 (M)SDN BHD 期間和之後演示階段。2.3 測試設備化學燃料電池 (M) SDN BHD 須提供所有檢測儀器和特殊的工具來執行演示,都須經雙方同意由 REDtone 和化學燃料電池 (M) SDN BHD 之前演示的開始。這種測試的儀器和工具應化學燃料電池 (M) SDN BHD 的財產2.4 化學有權更改規格的設備沒有任何事先通知到 REDtone。3 價格,開票,付款條件和付款計畫3.1.如果 REDtone 同意輸入的商用部署,REDtone 應專案開始提前支付了定金,化工燃料細胞 (M) SDN BHD 所附附件 c: 商業部署的報價。3.2 REDtone 應當支付為化學燃料電池 (M) SDN BHD設備租賃管理能源供應和服務對於 39 網站。3.3 REDtone 應當支付為化學燃料電池 (M) SDN BHD設備租賃和管理能源服務在每個季度advance after the Acceptance Test Procedure for CommercialDeployment as attached in ANNEX F: Acceptance Test Procedurefor Commercial Deployment (includes: Pre-Installation SiteInformation Checklist, ME2POWER System Setup Checklist,ME2POWER System Parameter Check List, ME2POWER OperationChecklist and Remote communication test).3.4 CHEM FUEL CELL (M) SDN BHD shall agree to provide Service Levelas attached in ANNEX E: Service Level.IN WITNESS WHEREOF, the Parties hereto have executed this Agreementthrough their respective authorized representatives as of the date writtenabove.REDtone TelecommunicationsSDN. BHD.CHEM FUEL CELL (M) SDNBHDBY: ______________________ BY: ______________________ANNEXES:ANNEX A: Detailed Specification of ME2 Power SystemANNEX B: Proof of Concept QuotationANNEX C: Commercial Deployment QuotationANNEX D: Acceptance Test Procedure for POCANNEX E: Service LevelANNEX F. Acceptance Test Procedure for Commercial DeploymentAnnex A. Detailed Specification of ME2 Power Supply SystemRated Power 5kWOperating Load 2.5kWVoltage 48V DCVoltage range 48~56V DCSize (L*W*H) 1.35 X 1.15 X 1.76mCase Material Aluminum AlloyWeight (Fuel notincluded)295kgFuel Methanol water (MEPlus)Fuel Tank Capacity 225 L(±193kg)Operating ambienttemperatureStandard type -5 ~ 46°CCommunication SNMPv2c, dry contactand optional wirelessmonitoringStandardCertificationCE, ANSI/CSA FC-1,Telcordia GR-63-CORESeismic Zone 4Operation time(225L fuel tank)2kW output rate 100 hrs,or 5kW output rate 40hrsNoise index <65dB @ 1 mAnnex B. Proof of Concept QuotationCustomer : REDtone Telecommunications SDN. BHD.Quotation No :Date :Item : Proof of Concept for Telecommunication System withOperating Load less than 2.5 kW for 720 hours (30calendar days)NO DESCRIPTIONTOTAL PRICE(MYR)1Fuel Cell 5 kW System (ME2Power) Leasing Price asspecified at annex A 3,769.002 Managed Energy Services (including fuel) 4,353.00Subtotal 8,122.00GST (6%) 487.30Total 8,609.30Terms & Conditions:1. Payment: The payment shall be made within 7 (seven) days after theeffective of this agreement.2. Delivery: The procurement and installation of the ME2Power System shallbe completed within 45 working days from the date CHEM Fuel CellMalaysia receives down payment.3. Validity: Valid until 30th November 2015.4. Above quote price is based on a 5 years SLA Lease Service program, that itare amortized on monthly basis for a total period of 60 months from theeffective date.5. The quoted hereinabove only applied to POC demo unit, and payable toCHEM Fuel Cell (M) SDN BHD on monthly in advance shall Customersatisfies the outcome of POC performance which
正在翻譯中..