Such analysis is performed by dimensioning the sewer network for a set of possible design rainfall return periods,T, and assessing the construction costs associated with each value of T. For each scenario, the total expected damage caused by rainfall events with return period greater than the design one, during the entire operation period of the infrastructure, is then evaluated by hydraulic simulation.