If the application for the manufacturers to repair, after repair, the works and equipment used by units together for acceptance, the acceptance by the later, site supervisor in "equipment repair and maintenance inspection alone" on the signature confirmation, works required manufacturers to open work ticket, and in the work ticket on the signature confirmation, equipment repair and maintenance works personnel will be "acceptance" and "NWEVII equipment repair and maintenance work report" and work ticket was works supervisor signature confirmation archived for future reference.
正在翻譯中..
![](//zhcntimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)