The dimensions of all the building rooms of this receiving station are evaluated according to the drawings of the bidding documents and used as the basis for the quotation
All building room sizes at this receiving station are evaluated according to the drawings of the tender documents and serve as the benchmark for quotations
The room dimensions of all buildings in the terminal are evaluated according to the drawings in the bidding document and used as the quotation basis<br>