Only signle lot should be in a process. The different lots should not be in the process ,even through they are same product.It is "Single Lot Operation".
In case of that one lot would use two machines or more in the process, That process should not allow to produce different lot until that lot is completed and go to next process.
And all lots of same product should be operated continuously.
(To prevent contamination of different lot, products)