Direct engineering costs mainly refer to labor fee, material fee and machinery use fee that directly constitute project entity during the formation of project cost .Construction material makes up 60% ~ 70% of the total project cost, and plays a decisive role in the whole project cost control. Material cost control can be realized in two aspects, namely the quantity control and price control.