● Provision of a controllable outlet structure to prevent the impoundment of water and prevent the long-term build-up of contaminants
● Provision of pipelines beneath the new highway to reinstate connectivity with groundwater sources and sporadic surface flows from Phase 2 into Phase 1
● Long-term monitoring to inform a management system with regard to setting upper water levels and provision of seasonal variability.