Finally, a testing of existing diseases of highway tunnel and rectification work as the engineering background, developed a remediation program corresponding to its. The tunnel disease treatment work has been completed, the engineering accident does not appear in the renovation of the construction process, after the rectification after the tunnel operating in good condition. This fully demonstrates that the proposed tunnel disease treatment measures and construction technology is effective and feasible, the hope for similar projects to provide relevant reference.
正在翻譯中..