INDEX SHEET
DRAWING INDEX
01 COLUMN LAYOUT PLAN
02
05
CROSS SECTION(MAIN FRAM B04)
DESIGN LOADS
FRAME LIVE LOAD: 0.3 KN/M
WIND SPEED: 130 km/hour
ENCLOSURE: ENCLOSED
EXPOSURE: C
2
SEISMIC ZONE: UBC - ZONE 3
ROOF LIVE LOAD: 0.57 KN/M2
INDEX SHEET
00
QUOTE NO.
BLDG. NAME : CRMTO Factory
BLDG. NO.
REV. NO.
CUSTOMER
DRN. BY
LOCATION
DATE CHK. BY CONFIRMED SHEET NO.
: 00
:
LBL HTV
: 01
: Yangon, Myanmar.
:
NGH
Crecimiento Industrial Co.,Ltd.
Q 095KI-404.15
28.04.2015
00
04
03 CROSS SECTION(MAIN FRAME B01, B02)
CROSS SECTION(MAIN FRAME WALK WAY OF B01, B02)
CROSS SECTION(MAIN FRAME B03)
06 MEZZANINE FLOOR PLAN
07 ROOF SHEETING PLAN
08 ENDWALL ELEVATION(B01, B02)
09 EDWALLL ELEVATION ( B03, B04)
10 SIDEWALL ELEVATION@ GL. A, D(B01, B04)
MEZZANINE LIVE LOAD: 3.0 KN/M2
11 SIDEWALL ELEVATION@ GL.E, H(B02)
12 SIDEWALL ELEVATION@ GL.I, K(B03)