According to practical needs and comparative analysis of geological exploration report and other studies, using hammer pile driving more responsive to actual needs, and more in favour of PC pile construction quality and progress control, the comparative analysis report is as follows:1. static pressure pile is allowed to reduce the shock of driving, but it is still dependent on soil compaction pile, so we cannot fundamentally solve the arising during the construction of PC pile soil compaction effect and its effect on surrounding buildings.2. static pressure static pile of pile depend on weight and counterweight at the rack to provide force PC-piles into the ground, generally speaking, Static pressure pile machine weight and distribution heavy of peace is pile end limit hosted force of 1.5 times times, to construction of chimney regional for cases, its pile end design limit hosted force for 4000KN, also that about 400 tons, is pressure pile machine and the distribution heavy of peace 600 tons, and hammer hit pile machine weight only for 60 tons, so static beat pile machine in walking and construction process in the on site road and the site damage more serious, pile construction progress and security will by must of effect, especially local and every rainy day more, rain after, ground more soft, " Heavy "of static beat pile machine Mobile will will very difficult, even will led to equipment fault,, led piling progress further deterioration, phase compared," quality light "of hammer hit pile machine on construction site of requirements lower, also more flexible, overcome external environment adverse effect of capacity also more strong, on site reality and the need,, hammer hit pile construction of progress far is better than static pressure pile.3. due to PC pile into pile mechanism is through squeeze soil into pile, is construction of pile on has completed of pile of side to cut pressure and both Zhijian of distance about, distance more near is side to cut pressure more big, to construction of chimney regional for cases, the regional PC pile distribution more key, into pile Shi squeeze soil effect obviously, will on has completed of pile produced larger of side to shear stress, if used static pressure method construction, due to static beat pile machine and Shang distribution heavy of huge weight makes its in walking and construction process in the will on has completed of pile produced larger of side to shear stress , To increased PC pile pile body by bear of shear stress, makes pile body a a at side to cut pressure had big, to caused pile body offset, even broken pile of situation (see attached page: static beat pile machine construction Shi main force schematic), phase compared,, used hammer hit method construction, hammer hit pile machine more light of weight on has completed of pile by produced side to shear stress smaller, for guarantee into pile quality, should priority select hammer hit pile to construction.4. used hammer hit pile construction, into sand level Shi, sand layer in pile end of impact and vibration of role Xia, will produced liquefied, anti-resistance capacity reduced, pile body by by of motorcycle resistance than used static pressure pile will obviously reduced, to increased has pile end penetrating sand layer of capacity, and static pressure pile in into sand level Shi, resistance had big, construction footage difficult, and pressure value will suddenly rose, may will caused pile body and the equipment of damage, to chimney regional for cases, the regional geological exploration hole, hole number S-48, and 49, and 50 data indicate that below the surface within the range of 30m to 50m wide distribution of high compacted sand layer (see attached sheet: regional geology investigation report of the chimney), static pressure pile of footage will bring very big difficulties, so the driven pile construction should be preferred. To sum up, according to the situation and report of the geological exploration data, driven pile construction is more in line with actual needs, more conducive to ensuring construction quality and more conducive to accelerating the construction schedule.
正在翻譯中..