Once the triangular shape structures are formed, horizontal members of the catchfan base layer can be installed to the vertical members one by one using couplers to fixed their position. Horizontal members are placed 500mm apart. Bracing will be installed on the catchfan base layer and crossbeams vertical layers according to the “01 View” and “Top View” of drawing no WLS/ARCH/CF01.