填方路基边坡:填方高度H<8米,边坡采用1:1.5;填方高度8<H≤16米时,边坡坡度1:1.75。
本设计路段路堤最大高度为7.137m,故边坡取1:1.5。
②路堑边坡
挖方边坡路基边坡的设计应减少对天然植被与山体的破坏,防止诱发地质灾害。其边坡形式与坡率应根据工程地质和水文地质条件、边坡高度、排水措施以及施工方法等综合确定。
挖方路基边坡:挖方高度H≤8米时,边坡坡度1:1;8<H≤16米时,边坡坡度1:1.5;中间设置1米宽的碎落台。
③半填半挖路基
半填半挖路基兼有路堤与路堑的特点,故应满足上述路基路堑对边坡的要求。另外,在挖方一侧宽度不足一幅行车道宽时,应该将路床深度内的原有土质全部挖除换填。
0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!
(3) the roadbed side slopeSubgrade slope can slope height h and width b the ratio of the slope.① embankment slopeCode for design of urban road subgrade under embankment slope is as follows: Earth roadbed side slope: fill height of H<8 m, slope 1:1.5; fill height when 8<H ≤ 16 m, slope 1:1.75. The design section of embankment maximum height is 7.137m, so the slope is 1:1.5.② slopeSlope of subgrade slope should be designed to reduce the natural vegetation and destruction of the Hill to prevent geological disasters. Its slope and the slope was the engineering geology and hydrogeology condition, height, slope and drainage measures and construction methods determined.Excavated roadbed side slope: cutting height h ≤ 8 meters, the slope when 1:1;8<H ≤ 16 m, slope 1:1.5; set 1 meter wide broken down in the middle.③ dig-fill subgradeDig-fill subgrade and embankment and cutting features, it should meet the requirements of cutting slope of subgrade. In addition, the cut side width less than one lane wide, road-all the original soil in depth should be removed for filling.
正在翻譯中..
結果 (英文) 2:[復制]
復制成功!
(3) embankment slope
embankment slope and slope height H ratio of the width b of the slope can be used to represent.
① embankment slope
embankment slope "Urban Roadbed design specifications" provides as follows:
Fill embankment slope: fill height H <8 meters, the slope of 1: 1.5; fill height of 8 <H≤16 meters, slope gradient of 1: 1.75.
The design of the road embankment maximum height of 7.137m, so take the slope of 1: 1.5.
② Cut Slope
design cut slope embankment slope should reduce the destruction of natural vegetation and mountains, to prevent induced geological disasters. Its slope form and slope rate should be determined in accordance with the comprehensive engineering geological and hydrogeological conditions, slope height, drainage measures and construction methods.
Embankment slope excavation: excavation H≤8 meters height, slope gradient 1: 1; 8 <H≤16 meters, slope gradient 1: 1.5; the middle setting 1 meter wide chipping station.
③ Cut - Fill subgrade
half - fill embankment roadbed and cutting both features, we shall meet on the slope above the roadbed cutting requirements. Further, when the cut side of the lane width is less than a width, should the original road bed soil depth within the entire excavation of replacement.
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!
(3) roadbed side slopeRoadbed slope can be expressed by the ratio of B to slope width H.Embankment slopeThe "urban road subgrade design code" provisions of the embankment slope as follows:Embankment slope: fill height H is less than 8 meters, the slope by 1:1.5; H > 8 filling height 16 meters, slope 1:1.75.The maximum height of road embankment in this design is 7.137m, so the slope is 1:1.5.The cutting slopeThe design of excavation slope of subgrade slope should be reduced to natural vegetation and mountain damage, prevent geological disasters. The slope form and slope rate shall be determined according to the engineering geology and hydro geological conditions, the slope height, drainage measures and construction methods.The excavation of roadbed slope excavation height: H less than 8 meters, the slope gradient of 1:1; 8 H > 16 meters, slope gradient of 1:1.5; set up in the middle of 1 meters wide broken down.Half filled and half excavated roadbedHalf filling and half dug embankment with embankment and cutting, therefore should meet the requirements of cutting slope of subgrade. In addition, in the excavation side less than the width of a lane width, should be within the depth of the original soil roadbed excavation replacement.
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: