根据天然气炉安装图筑炉,坑的深度一般是使天然气炉工作台面与地平面间的高度在300-500mm之间为宜,在此须同时考虑铺设电线管及进出水管的位的英文翻譯

根据天然气炉安装图筑炉,坑的深度一般是使天然气炉工作台面与地平面间的高


根据天然气炉安装图筑炉,坑的深度一般是使天然气炉工作台面与地平面间的高度在300-500mm之间为宜,在此须同时考虑铺设电线管及进出水管的位置。
炉体安装时应校正电炉工作台面与地面的水平度。

检查加热烧嘴、控制柜、热电偶与补尝导线,通风机装置,液压装置,断路安全装置等所有导线的接线端部份,接触是否良好,并注意带电部份不能有短路现象。
根据接地线的位置,应接上可靠的接地线(包括电炉配用的控制柜等配套设备),以保证操作人员安全。
接上风扇轴水套进出管,并检查套其是否渗漏。
检查液压装置中油管、油泵及油缸联接是否良好,并注意联接处不得有渗漏现象。
油泵电机应按外部接线图接线,并检查其转动方向是否正确。
将升降轴上的限位紧圈调至适当的位置就位。
安装完毕应检查电炉各动作是否运转正常和协调。
0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!

According gas furnace installation diagram brickwork, the depth of the pit is usually the natural gas furnace work surface height between the ground plane in between 300-500mm is appropriate, in considering both conduit and the inlet and outlet pipe laying position.
Correction furnace furnace installation should work surface with the ground level of degree.

Check the heating burner, control cabinet, and to compensate for the thermocouple wires, fans, hydraulic device, disconnect all conductors of safety devices, etc. terminal part of the contact is good, and note that live parts can not have a short circuit.
Based on the location of the ground wire should be connected to a reliable ground wire (including electric furnace equipped with a control cabinet and other equipment),To ensure operator safety.
Connect the fan shaft and out of the water jacket tube and check for leaks sets it.
Check the hydraulic unit tubing, pump and tank connection is good, and note may not have the joint of leakage.
Pump motor shall be an external connection diagram and check the direction of rotation is correct.
The elevator shaft stopper tight circle transferred to the appropriate location in place.
Installed furnace should be checked whether each operation in normal operation and coordination.
正在翻譯中..
結果 (英文) 2:[復制]
復制成功!

according to gas furnace installation of the furnace, the depth of the pit is generally make gas furnace working table and the horizontal plane is 300-500mm in height is appropriate, this should consider the wire pipe and water outlet pipe laying position. The level of
furnace installation should be corrected with the ground electric furnace work table.

check the heating burner, control cabinet, thermocouple and compensation wire, hydraulic unit fan unit, terminal part of circuit breaker, safety device and so on all conductors, contact is good, and pay attention to live parts not short circuit.
according to the grounding line position, should be reliable grounding wire (including the control cabinet and other ancillary equipment electric furnace with),To ensure the safety of operators.
the fan shaft water inlet and outlet pipes, and check whether leakage set. Check the hydraulic device,
tubing pump and cylinder connection is good, and pay attention to the connection must not have the leakage phenomenon.
pump motor should be the external wiring diagram and wiring, check the rotation direction is correct.
the positions. A locking ring to the appropriate limit lift shaft.
installed should check whether the normal operation of electric furnace each action and coordination.
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!

According to the natural gas furnace installed furnace, the depth of the hole is to make natural gas furnaces work surface height between ground level and between 300-500mm, and must also consider the location of wiring tubes and in and out of the water pipe.
Electric furnace installation should be correction work surface level with the ground.

Check burner, control cabinet, thermocouples with compensated for wire, fan, hydraulic devices, circuit breakers safety devices all the terminals of the wire, such as parts of contact is good, and that live parts cannot have a short circuit.
Depending on where the ground wire, yingjie on reliable earthing lines (including equipment such as electric control cabinet equipped with),To ensure the safety of the operator.
Water inlet and outlet pipes connected to the fan shaft, and check for leakage.
Checked pipes, pumps and hydraulic cylinders in the hydraulic devices connection is good, and joined there shall be no leakage.
External wiring diagram wiring pump motor, and check the direction of rotation is correct.
Lift the spacing tight ring on the shaft to the proper location in place.
Installed check that the furnace is running and coordination.
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.